全体外预应力节段拼装混凝土桥梁工程质量检验与评定
全体外预应力节段拼装混凝土桥梁工程质量检验与评定
目
录
10.2
钢筋工程 ································································ 1
10.2.1
基本要求·········································································· 1
10.2.2
检验项目·········································································· 1
10.2.3
外观鉴定·········································································· 1
10.3
构件浇筑 ································································ 1
10.3.1
基本要求·········································································· 1
10.3.2
检验项目·········································································· 1
10.3.3
外观鉴定·········································································· 2
10.4
节段拼装 ································································ 2
10.4.1
基本要求·········································································· 2
10.4.2
检验项目·········································································· 2
10.4.3
外观评定·········································································· 3
第 1 页
共 3 页 10.2
钢筋工程 10.2.1
基本要求 10.2.1.1
钢筋的保护层厚度应满足设计要求。
10.2.1.2
钢筋安装时,必须保证设计要求的钢筋根数。
10.2.1.3
受力钢筋表面不得有裂纹或其他损伤。
10.2.2
检验项目 钢筋工程的质量检验实测项目应符合表 15 的规定。
表 15 钢筋工程检查项目 项次 检查项目 规定值或 允许偏差 检查方法和频率 权值 1 受力钢筋间距 (mm)
两排以上排距 ±5 尺量:每构件检查 2 个断面 3 同排 ±10 2 箍筋间距 ±10 尺量:每构件检查 5 个间距 2 3 钢筋骨架尺寸 长 ±10 尺量:按骨架总数 30%抽查 1 宽、高 ±5 4 弯起钢筋位置 ±20 尺量:每骨架抽查 30% 2 5 保护层厚度 ±5 尺量:每构件沿模板周边检查 8 处 3 10.2.3
外观鉴定 10.2.3.1
钢筋表面无铁锈及焊渣。不符合要求时减 1~3 分。
10.2.3.2
必须保证钢筋骨架施工刚度。不符合要求时减 1~3 分。
10.3
构件浇筑 10.3.1
基本要求 10.3.1.1
构件预制材料的质量规格应符合有关规范的要求,按规定的配合比施工。
10.3.1.2
预制构件不得出现露筋和空洞现象。
10.3.2
检验项目 钢筋工程的质量检验实测项目应符合表 16 的规定。
表 16 节段浇筑检查项目 项次 检查项目 允许偏差 检查方法及检查频率 权值 1 混凝土强度 满足设计要求 按 JTG F80/1-2012 附录 D 检查 3 2 节段长度 ±2mm 用尺测量,不小于 3 组 2 3 节段宽度 ±5mm 用尺测量,不小于 3 组 2 4 梁高 -4,2 用尺测量,不小于 3 组 2 5 厚度 顶、底板 +5,-3 用尺测量,每个断面单项不小于 3 组 1 腹板 1 横隔板 1 6 平整度 5mm 用 2m 以上钢直尺测量(拉毛,粗糙)
1
第 2 页
共 3 页 项次 检查项目 允许偏差 检查方法及检查频率 权值 7 预埋件 5mm 用 2m 以上钢直尺测量 2 8 预留孔位置 ±5mm 用尺测量,包括横向及纵向相对位置 2 10.3.3
外观鉴定 10.3.3.1
蜂窝麻面面积不得超过该面面积的 1%。不符合要求时,每超过 1%减 3 分。
10.3.3.2
增加量化指标,混凝土表面平整度不得超过 5mm。
10.3.3.3
胶接缝不得出现明显损伤。不符合要求时减 1~2 分。
10.4
节段拼装 10.4.1
基本要求 10.4.1.1
各接缝位置高程及平面位置准确,剪力键对接准确。
10.4.1.2
节段吊装过程应保持稳定,顶板保持水平,梁段出现转动、切斜时,应立即停止吊装,分析原因。
10.4.1.3
主梁拼装定位应按照本指南第 9.3
条规定执行。
10.4.2
检验项目 节段拼装的质量检验项目应符合表 12~表 14 的规定。
表 17 墩顶节段检查项目 项次 检查项目 规定值或允许 偏差 检查方法及检查频率 权值 1 轴线偏位 2 全站仪,不少于 2 处 2 2 四角顶面高程 ±2 全站仪,不小于 2 组 2 3 纵向位置 5 全站仪,不少于 3 组 2 表 18 普通节段检查项目 项次 检查项目 规定值或允许 偏差 检查方法 权值 1 轴线偏位 (mm) 3 全站仪:BH、FH 点 2 2 梁顶面高程(mm) ±3 全站仪:BR、FR、BL、FL 点 2 3 胶拼缝错台(mm) ±2 用游标卡尺量 2 4 相邻节段间顶面接缝高差( mm)
2 用水准仪检查每条缝、直尺量
1 5 桥面平整度(mm) ≤3 按照路面平整度测量要求测 量
1 表 19 湿接缝两侧节段检查项目 项次 检查项目 规定值或允许 偏差 检查方法 权值 1 轴线横向偏位(mm) 5 全站仪:BH、FH 点 2 2 腹板处梁顶高程差(mm) 3 全站仪:BR、FR、BL、FL 点 2 3 翼缘板处梁顶高程差(mm) 5 用游标卡尺量 1 4 湿接缝宽度(cm) ±2 直尺量 1
第 3 页
共 3 页 10.4.3
外观评定 10.4.3.1
节段外壁顺直,胶接缝平整,无开裂和脱落现象。
10.4.3.2
外露混凝土表面平整,色泽一致。不符合要求时减 1~2 分。
10.4.3.3
施工完成后,桥面平顺。不符合要求时减 1~2 分。
相关热词搜索: 预应力 拼装 体外热门文章:
- XX镇镇长述责述廉报告2025-01-11
- 2024年关于学习贯彻主题教育...2025-01-11
- (6篇)主要负责人述法报告(...2025-01-10
- 2024年副县长履职情况报告【...2025-01-09
- 2024年中国工会十八大报告(...2025-01-08
- 2024年(3篇)XX区人大代表履...2025-01-07
- 高校后勤巡察自查报告2024-01-08
- 2024年度某商务局个人述责述...2024-01-07
- 2024年度党费工作自查报告(...2024-01-05
- 2024年XX市关于打造全国一流...2024-01-02
相关文章:
- 桥梁预应力张拉和孔道压浆施...2021-08-27
- 全体外预应力节段拼装混凝土...2021-08-27
- 全体外预应力节段拼装混凝土...2021-08-27
- 全体外预应力节段拼装混凝土...2021-08-27
- 桥梁工程施工预应力技术应用2021-08-27
- 预应力锚夹片机械加工质量控...2021-08-27
- 工程监理项目部高强预应力管...2021-10-19
- 工程监理项目部高强预应力混...2021-10-19
- 监理部佛山某项目预应力混凝...2021-10-23
- 诸光路通道拼装小结(完整版)2021-09-28
- 报废拼装无牌无证等非法车辆...2021-09-29
- 报废、拼装、无牌无证等非法...2021-10-05
- 从专用发票入手遏制体外循环2022-02-16
- 右美托咪定在婴幼儿体外循环...2022-10-24
- 体外震动排痰仪治疗社区获得...2022-10-24
- 术前呼吸功能锻炼对减少体外...2022-10-24